Jefferson Barracks Storage Facility

jefferson-barracks-unheated-storage

Accomplished As Promised

The State of Missouri Office of Administration Facilities Management, Design, and Construction needed a 7,814 square foot unheated storage facility. The Work included concrete, pre-engineered metal building, and electrical structures.

Lessons Learned

As one of the National Cemetery Administration’s oldest burial sites for soldiers, their project required careful hands. A. Eilers Construction is a recognized recipient of verified efforts to recruit, employ, and retain veterans. The Missouri National Guard was inspired to work with a prestigious government backed contractor for this project.

Triumphs

Our team efficiently installed an unheated storage facility with metal enclosures and motion-sensor lighting throughout the interior of the building. The exterior was designed and curated with care from Kirby Building Systems, a respected metal building supplier.